Your Easy Loader kennel arrives unassembled and goes together with basic hand tools in a few minutes. Follow the steps below in order. The first step is the one most people skip, and it is the one that causes the trouble, so start there.
Download printable instructions (PDF)What Is in the Box
Every Easy Loader kennel ships with:
- Top half of the kennel, with stainless steel handles
- Bottom half of the kennel
- Gates, with pins and springs
- Kennel dividers
- Hardware bag
- This instruction sheet
Quantities vary by model. The Original and the Deuce have two gates and one divider. The Triple has three gates and two dividers. The EZXL has two gates and one divider. Assembly is identical across all four models — only the number of gates and dividers changes.
What You Will Need
- A 5/16 inch nut driver. Not required, but it makes the job considerably faster.
- A drill, only if you want to add drain holes. See the notes below.
Assembly Steps
Step 1 — Assemble the latch pins
Do this before anything else. The latch pins go into the gates, and it is far easier to do now than after the kennel is together.
- Remove the stainless steel latch pins from the ends of the spring brackets. Be careful not to lose the springs.
- Install both pins through the center guide and through the holes in the spring brackets, sliding the springs onto the pins as you push them through the bracket holes.
- Compress the springs and insert the hitch pin through the small hole in each latch pin. The round head of the hitch pin should face toward the outside edge of the gate.
Repeat for each gate. The Triple has three.
Step 2 — Install the divider
Set the bottom half of the kennel on the floor or another flat surface.
Place the black plastic divider in position. On the Original, the Deuce, and the EZXL there is one divider and it goes in the center. On the Triple there are two dividers, one at each bay partition.
Secure each divider with a bolt passing through the outside of the kennel and a black thumb nut on the inside, at both the front and the back. Leave these nuts slightly loose for now. You will tighten everything at the end.
Step 3 — Set the top in place and hang the gates
Set the top half of the kennel onto the bottom half.
Insert bolts into the back two corners, going from the top down. Start the nuts but do not tighten them yet.
Now hang the gates by inserting the hinge pins into the holes at the top and bottom of each opening. The gates are designed to open in either direction, so there is no wrong side.
Step 4 — Install the remaining hardware
Install all remaining bolts through the top of the flanges, securing the nuts from underneath. Do not tighten yet.
Step 5 — Attach the divider and tighten everything
Attach each divider to the top half of the kennel, installing the rear bolt and nut first.
Now go back and tighten all bolts and nuts. A 5/16 inch nut driver makes this much easier. Do not over-tighten.
That is it. Your kennel is ready to use.
Notes
Drain holes
Drain holes are not pre-drilled, so you can put them where they suit you. Use a drill bit and place them wherever you prefer.
Ventilation
We offer vents and vent kits for added ventilation, supplied to match your kennel. A two-gate kennel receives two vents.
Cold Weather Door Covers
Optional cold weather door covers block approximately 90 percent of the door opening, which makes a real difference on cold or wet days.
Each cover mounts with two bolts, a rubber washer, and a hitch pin, as shown below.
To order, call 1-800-853-2655. View cold weather door covers.
Still Stuck?
Call us at 1-800-853-2655. Gate assembly is the question we get asked most, so you will not be the first, and we would rather walk you through it than have you fight with it.